Building Permit Requirements in Morong, Rizal
(2025 Updated)
Last verified: December 3, 2024
Quick Summary
Estimated Fees
Contact Municipal Engineering Office for current fee schedule
Processing Time
2-4 weeks including clearances
Plan Sets Required
5 sets
Documentary Requirements
Check off items as you prepare them:
- Five (5) complete sets of detailed plans duly signed and sealed by engineers
- Structural design analysis (for 2+ storey buildings)
- Boring and load test, seismic analysis, compressive strength for concrete and strength for re-bars (for 3+ storey buildings)
- Contract of sale/lease, deed of absolute sale, or affidavit of consent (if not registered owner)
- Bill of materials and specification signed and sealed
- Photocopy of PRC license and PTR number of design professionals
- Clearances from concerned agencies
- TCT or Tax Declaration
- Tax Clearance
- Barangay Clearance
- Locational Clearance
- Fire Safety Evaluation Clearance (FSEC)
Required Clearances
Barangay Clearance
- Valid ID of applicant/owner
- Proof of ownership (TCT or Tax Declaration)
- Cedula
Locational Clearance
- Application form
- Barangay Clearance
- TCT or Tax Declaration copy
- Site development plan
Fire Safety Evaluation Clearance (FSEC)
- Building plans with fire safety features
- Electrical layout
Tips
- Engineering Office: (02) 451-2773 local 110
- Location: Ground Floor, New Municipal Building, San Pedro, Morong, Rizal
- Engineering forms: morongrizal.gov.ph/download_category/engineering-forms
- Building permit form: morongrizal.gov.ph/download/building-permit-application-form
- Structural design analysis required for 2+ storey buildings
- Boring test, seismic analysis required for 3+ storey buildings
- Also handles Certificate of Annual Inspection for Business Permit
Common Mistakes
- Missing PRC license and PTR copies of design professionals
- Missing structural design analysis for 2+ storey buildings
- Missing boring/seismic analysis for 3+ storey buildings
- Missing signed bill of materials
Frequently Asked Questions
What is the contact for Morong Municipal Engineering Office?
Call (02) 451-2773 local 110. Office is on the Ground Floor, New Municipal Building, San Pedro, Morong, Rizal. Open Monday-Friday, 8am-5pm.
What special requirements does Morong have for multi-storey buildings?
For 2+ storey buildings: structural design analysis required. For 3+ storey buildings: boring and load test, seismic analysis, compressive strength for concrete, and strength for re-bars are required.
Download Checklist
Get a printable PDF checklist for your building permit application
Email required for download
Office Location
Morong City Hall
View on Google Maps
Morong Municipal Hall, Morong, Rizal
Landmark: Near Morong Beach
Contact Information
Municipal Engineering Office, Ground Floor, New Municipal Building, San Pedro, Morong, Rizal
Monday-Friday, 8:00 AM - 5:00 PM